version in Deutsch | english version | wersja polska
Dumps
In production plants or in loose material processing plants exists necessity to measure dumps capacity (in order to compare the real and theoretical state of dumps capacity). Dumps capacity verification conduct by 3P consist in:
  • virtual image of dumps' terrain configuration (basing either on previous measurements or technical documentation),
  • measurements mesh of points densely disposed on dump's surface.